6.) At any stage, trackball to the Pause button and press Set, if required.
7.) To resume testing (from the point where you paused), trackball to the Start button and press Set.
When the RFI Demodulator Short Test sequence is complete:
-
-
8.) If necessary, use the scroll bars and/or arrows to scroll through the list of Test results.
Note:
For this test, there is one report (Demodulator Short Test report) which is listed in the
Reports window on the right. By default, this report is displayed in the Reports window
below
complete report if necessary.
9) When done, trackball to the Exit button and press Set to close the View Report window.
1
EVISION
Green: All recommended tests for these components have been completed and no problems
were identified.
Red:
Problems were identified in these components during the performance of the test.
Yellow: The tests executed so far on these components have passed, but not all
recommended tests have been performed.
the Diagnostic Test window displays the Finished message
the View Test Log window opens automatically, listing all tests performed and showing details
of which tests passed or failed, as shown in the example in
Figure 7-18 View Test Log - RFI Demodulator Short Test
(Figure
7-18). Use the Report window scroll bars and/or arrows to scroll through
Chapter 7 - Diagnostics/Troubleshooting
V
V
N S
IVID I N AND
IVID Q
Figure
7-18.
M
ERVICE
ANUAL
7-41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid q nFl000110Fl000090Fq000001Vivid-iVivid-q

Table of Contents