The ACW BPF Test commences. While the test proceeds, the name of the test currently in progress
(ACW BPF Test) is displayed in the Execute field and the current Loop # and specific test are shown
below. The messages Init Done and Please Wait are displayed beside the progress bar in the
Status area.
As the testing sequence progresses, the progress bar will advance to reflect the test progress.
Status indicators in the Data Flow map corresponding to the various system components will be
highlighted in the appropriate color to indicate the current test status, as follows:
5.) At any stage, trackball to the Pause button and press Set, if required.
6.) To resume testing (from the point where you paused), trackball to the Start button and press Set.
When the ACW BPF Test sequence is complete:
-
-
Note:
The ACW BPF Test has four test reports (BPF0, BPF1, BPF2, and BPF3) which are listed
in the Reports window on the right. By default, the BPF0 report is displayed in the Reports
window below
7-76
1
EVISION
Green: All recommended tests for these components have been completed and no problems
were identified.
Red:
Problems were identified in these components during the performance of the test.
Yellow: The tests executed so far on these components have passed, but not all
recommended tests have been performed.
the Diagnostic Test window displays the Finished message
the View Test Log window opens automatically, listing all tests performed and showing details
of which tests passed or failed, as shown in the example in
Figure 7-48 View Test Log - ACW BPF Test - BPF0
(Figure
7-48).
Section 7-4 - Performing Front End (FE) Diagnostics
V
V
N S
IVID I N AND
IVID Q
Figure
7-48.
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid q nFl000110Fl000090Fq000001Vivid-iVivid-q

Table of Contents