You can install one AT-XS910/8 switch in a row of the equipment rack or
two AT-XS910/8 switches in one row of the equipment rack as shown in
Figure 13.
Figure 13. Rack Installation Options
Before planning to install the switch on an equipment rack, review the
following guidelines:
To install one AT-XS910/8 switch in an equipment rack, use the
AT-RKMT-J14 rack mount kit.
To install two AT-XS910/8 switches in one plate to an equipment
rack, use the AT-RKMT-J15 rack mount kit.
Note
You must purchase the AT-RKMT-J14 or AT-RKMT-J15 rack mount
kit separately.
You can either one switch or two switches in a row of an equipment rack:
To install one switch on an equipment rack, see "Installation Using
the AT-RKMT-J14 Rack Mount Kit" on page 47.
To install one switch on an equipment rack, see "Installation Using
the AT-RKMT-J15 Rack Mount Kit" on page 51.