Self Test Phase - Siare Morpheus ND User Manual

Anaesthesia unit
Table of Contents

Advertisement

3.2.1 Self Test phase

During Self Test phase, the software carries out the self-diagnostic tests and checks
a series of devices necessary for safe operation of the Unit /patient ( for further
details ABOUT self test,please see on chapter see on 4.7.1 ).
3-6
The anaesthesia unit turns ON and
the automatic Self Test phase
starts.
Please close the patient circuit.
Acoustic Alarm test :
acoustic alarm is audible, please
push the RESET key ".
The Self Test phase completed
successfully.
Press OK to begin
Press Cancel for other tests
User manual, DU33ND101
"
If the

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents