Anaesthesia Unit Switching On - Self Test Phase - Siare Morpheus ND User Manual

Anaesthesia unit
Table of Contents

Advertisement

5.2

Anaesthesia Unit switching ON - Self Test phase

Set the main switch (placed on the back side of the anaesthesia unit) to " I ".
Make sure that on the unit keyboard (commands area) the green led (indicating the presence of
mains power supply) is ON.
Hold the STANDBY ON-OFF key for few seconds; the unit switches ON and the automatic Self
Test phase starts.
During the Self Test phase, the software carries out the self-diagnostic tests and
checks a series of devices necessary for safe operation of the User / Patient.
Morpheus_ND
The anaesthesia unit turns ON and
the automatic Self Test phase
starts.
Please close the patient circuit.
Self Test phase in progress.
5-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents