5.2
Anaesthesia Unit switching ON - Self Test phase
•
Set the main switch (placed on the back side of the anaesthesia unit) to " I ".
•
Make sure that on the unit keyboard (commands area) the green led (indicating the presence of
mains power supply) is ON.
•
Hold the STANDBY ON-OFF key for few seconds; the unit switches ON and the automatic Self
Test phase starts.
During the Self Test phase, the software carries out the self-diagnostic tests and
checks a series of devices necessary for safe operation of the User / Patient.
Morpheus_ND
•
The anaesthesia unit turns ON and
the automatic Self Test phase
starts.
•
Please close the patient circuit.
•
Self Test phase in progress.
5-7