Preparation To Use; Medical Gas Connection - Siare Morpheus ND User Manual

Anaesthesia unit
Table of Contents

Advertisement

4.3

Preparation to use

4.3.1 Medical gas connection

Screw the gas supply hoses to relevant connectors
of the gas supply group.
Screw the gas supply hoses to the relevant
connectors of the hospital distribution system.
Ensure that all the supply hoses are connected and
are correctly working.
The hoses are already supplied with screw connections DISS type (Diameter Index
Safety System) for connection to the anaesthesia unit connectors. The installation
technician taking care of the hoses connection to the outlets must ensure that they
are compatible with the hospital medical gas pipeline system.
To prevent inversions of gases that can be FATAL for the patient, assembly of the
connectors compatible with the hospital distribution system and all the maintenance
and/or replacement operations of the medical gas supply hoses must be carried out
by highly qualified technical personnel only.
WARNING !! Risk of equipment failure
In order that the anaesthesia unit operates as specified, the inlet pressures of
medical gases must be between 280 kPa and 600 kPa (2.8 - 6 bar). Before use
ensure that this requirement is met.
The medical gas source shouldn't contain water: if you suspect the presence of
water, connect a water trap to avoid damages on the unit and its components.
4-6
With the unit operating by TURBINE, it is anyhow necessary the presence of an
oxygen supply, useful for the operating of the internal pneumatic system.
The equipment can also work with oxygen supply only, but in this case the FiO
will be adjustable at 99% only.
The gas used must be of medical type, therefore oil free and filtered.
2
User manual, DU33ND101

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents