Maintenance - Siare Morpheus ND User Manual

Anaesthesia unit
Table of Contents

Advertisement

7

MAINTENANCE

Morpheus_ND
To guarantee the regular operation of the Morpheus_ND anaesthesia unit,
perform the following maintenance interventions with the recommended
frequency.
All interventions must comply with the practice and protocols in force in each
facility.
The instructions for carrying out further detailed tests, for trouble-shooting and
for additional interventional procedures, information intended for qualified
technical personnel, are contained in the dedicated chapter.
On completion of the maintenance operations, all removed components should
be disposed according to current waste disposal regulations.
Components that cannot be destroyed should be sterilised before disposal.
Follow current regulations for the disposal or recycling of all removed
components.
WARNING !!
Risk of injury for the User / Patient
To ensure the safety of the patient and the User, the anaesthesia unit must be
inspected and checked when the limit of 1000 working hours has been reached
or, in the event of limited use of the machine, at least every 6 months.
All maintenance and/or repair operations require perfect knowledge of the
equipment and therefore must be carried out only by highly qualified personnel,
specifically trained and formally authorised by SIARE.
Inappropriate intervention or unauthorised modifications can compromise safety
and cause danger to the patient.
To avoid the danger of electric shock during maintenance and/or repair operations,
make sure that all power supplies have been disconnected, disconnect the power
supply source (positioning the special danger signs) and disable all the protection
switches of the equipment.
Before performing the maintenance or repairing works, also in case of returning the
equipment for repairing to manufacturer, it is required to clean and disinfect the
equipment.
7-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents