Power-On / Self Test Phase - Siare Morpheus ND User Manual

Anaesthesia unit
Table of Contents

Advertisement

4.8

Power-ON / Self Test phase

Set the main switch (placed on the back side of the anaesthesia unit) to "
Make sure that the green led (that indicates the presence of mains power supply) is ON on the
unit keyboard (commands area)
Hold the STANDBY ON-OFF key for few seconds; the unit switches ON and the automatic Self
Test phase starts.
Self Test phase
During Self Test phase, the software carries out the self-diagnostic tests and checks
a series of devices necessary for safe operation of the Unit /patient.
4-22
- Please close the patient circuit - .
I
".
The anaesthesia unit turns ON and the
automatic Self Test phase begins.
" Please close the patient circuit "
Self Test phase in progress.
User manual, DU33ND101

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents