Preparation For Installation On Upstream Connection Machine Side - Canon Staple Finisher-D1 Service Manual

Hide thumbs Also See for Staple Finisher-D1:
Table of Contents

Advertisement

Preparation for Installation on Upstream Connection Machine Side [Booklet Finisher-D1 only]
Connecting to Host Machine
1) Remove three covers on the left side of the host machine.
2) Using four screws, attach two ground plates and two latch catches (front and rear) on the
left side of the host machine together.
x4
6
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Booklet Finisher-D1 only] > Connecting to Host Machine
F-6-45
F-6-45
F-6-46
F-6-46
6
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Booklet Finisher-D1 only] > Connecting to Host Machine
3) Attach the positioning pin using two screws.
MEMO:
The ground plate and latch
catch have three screw
holes each. Use the upper
and lower screw holes to
attach the latch catch. Do
not use the center screw
hole.
A pair of the ground plates
and the latch catches are
identical to each other.
x2
6-20
F-6-47
F-6-47
6-20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Booklet finisher-d1

Table of Contents