4.
Attach a gear puller to the pump side gear of the main
clutch assembly.
5.
Pull the pump side gear (1) and tapered bearing (2)
off together.
6.
Remove only two cap screws from the multi-disk
clutch assembly 180 ° apart.
NOTE: Do not, under any circumstances, loosen all fas-
tening screws of the multi-disk clutch. The pressure plate
is under very high spring pressure. Improper disassembly
of the multi-disk clutch will cause severe personal injury.
7.
Turn two M8 all-thread rods (1) (203-254 mm [8-10
in] in length) into the clutch assembly where the cap
screws were installed.
POWER TRAIN - PROCESS DRIVE Primary process drive
2 4/7/2006
C.50.B / 47
4
10004293
5
10004294
6
10004295