7.
Connect the pipe bracket (2) to the gearbox with two
cap screws (1).
8.
Lift the hydrostatic pump into place and attach to the
gearbox with four cap screws. Torque the mounting
cap screws to 190-210 N·m (140-155 ft. lbs.).
NOTE: The main hydrostatic pump weighs approximately
137 kg (303 lbs).
9.
Turn on a new oil filter (2). Install the hydraulic line
(1).
POWER TRAIN - PROCESS DRIVE Primary process drive
2 4/7/2006
C.50.B / 24
7
10012193
8
10012190
9
10012189_897