4.
Lubricate and set into place on the gearbox six man-
ifold O rings.
Carefully rest the manifold on the gearbox and se-
cure using four long cap screws (1). Torque to four
cap screws to 28 N·m (21 ft. lbs.).
5.
Attach the oil filler tube (3) to the gearbox with three
cap screws (2). Connect the hydraulic lines (1) to the
filler tube.
6.
Secure the pump suction and gearbox drain lines (1)
to the appropriate fittings with hose clamps.
Attach the sump oil temperature sender connector
(2).
POWER TRAIN - PROCESS DRIVE Primary process drive
2 4/7/2006
C.50.B / 23
4
10002717_896
5
10002715
6
10012194