Control valve - Install (C.20.F.13 - F.10.A.15)
1.
In preparation for installing the control valve, place a
new gasket on the housing. Inspect to assure that
the control orifice and spring are in the proper posi-
tion in the control valve.
2.
Engage the pin (1) on the control linkage in the mat-
ing hole (2) in the link attached to the swash plate.
Set control valve into place.
3.
Move the control (1) into place against the pump
housing, align the gasket and install the cap screws.
Torque the cap screws (1) to 16 N·m (12 ft. lbs.).
4.
Attach the connector at (1).
POWER TRAIN - TRANSMISSION Hydrostatic
2 4/7/2006
C.20.F / 55
1
40013259
2
40013256_957
3
40013255