New Holland CX720 Repair Manual page 2589

Hide thumbs Also See for CX720:
Table of Contents

Advertisement

10.
Attach the hydraulic line (1) to the hydrostatic pump.
Plug the connector (3), in the Electronic Displace-
ment Control (EDC) Valve. Connect the wire (2) to
the oil pressure switch.
11.
Secure the main hydrostatic pump lines (2) using four
cap screws on each fitting. Torque the cap screws to
159 N·m (117 ft. lbs.).
12.
Using the appropriate lifting gear, set the hydraulic
pump into place and secure using two mounting nuts
and washers (1).
NOTE: The high/low pressure hydraulic pump weighs ap-
proximately 29 kg (63 lbs).
POWER TRAIN - PROCESS DRIVE Primary process drive
2 4/7/2006
C.50.B / 25
10
10012188
11
10012187
12
10012185_893

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx740Cx760Cx780Cx820Cx840Cx860 ... Show all

Table of Contents