Mounting - Siemens SINAMICS S120 Equipment Manual

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Drilling patterns for push through PM240-2 Power Modules
Push through PM240-2 Power Modules with external cooling are mounted in mounting
frames in order to maintain the IP54 degree of protection. You can find a description of the
mounting frames with dimensions and drilling patterns in Chapter Accessories/mounting
frames (Page 359).
5.2.6

Mounting

Fire through overheating due to insufficient ventilation clearances
Insufficient ventilation clearances result in overheating with danger to persons as a result of
smoke and fire. This can also result in increased downtime and reduced service lives for
devices/systems.
• Always install the Power Modules vertical with the line and motor connections below.
• When mounting, maintain a 1 mm clearance between components.
• Ensure the following ventilation clearances above and below the component:
• Only install devices in this area that do not obstruct the flow of cooling air.
• Ensure that the cooling air can flow through the Power Modules unobstructed.
Note
Mounting instructions
• You must mount the PM240-2 Push Through Power Modules on an unpainted metal
surface in order to comply with EMC requirements.
• To be able to mount PM240-2 Push Through Power Modules, the wall thickness of the
cabinet must be ≤ 3.5 mm.
AC Drive
Manual, 06/2019, 6SL3097-5AL00-0BP1
WARNING
– For PM240-2 FSA, FSB and FSC Power Modules:
- Above: 80 mm (3.15 inch)
- Below: 100 mm (3.93 inch)
– For PM240-2 FSD, FSE, FSF and FSG Power Modules:
- Above: 300 mm (11.81 inch)
- Below: 350 mm (13.78 inch)
- Front: 100 mm (3.94 inch)
5.2 Blocksize Power Modules (PM240-2)
Power Modules
109

Advertisement

Table of Contents
loading

Table of Contents