IV and CV Device Characterization

Running the IV and CV Tests

1 For specified accuracy, allow the power device analyzer to warm up for a
2 Select and install the appropriate B1506A accessory module or adapter for
3 Install your device to be tested (Device Under Test or DUT) in the Test
4 From the Windows Start button, select All Programs > Keysight > PD1000A
46
IV and CV characterization tests with InTEST HP289-PM Thermal
Platform are done over a wide temperature range in the test
chamber. These tests can take several hours as the temperature
must stabilize within the test chamber.
minimum of one hour before running any IV and CV tests.
connecting your device under test.
Chamber in the selected B1506A or B1505A accessory.
To avoid electrical shock and instrument damage, turn all
instruments off before connecting cables or inserting a device to
be tested.
Control.
Keysight PD1000A Power Device Measurement System Startup Guide

Running the IV and CV Tests