B1505A Setup - Keysight PD1000A Startup Manual

Power device measurement system for advanced modeling
Hide thumbs Also See for PD1000A:
Table of Contents

Advertisement

IV and CV Test Requirements
InTEST Thermal Hot
Plate pass through
connector. Connect
to Thermal Platform
Controller
Figure 6
3 After completing the cable connections described above, verify the operation
4 Install the InTEST Hot Plate in the B1506A Test Chamber and connect the

B1505A Setup

1 Unlike the B1505A, the B1505A doesn't have a fixed configuration. To use the
Keysight PD1000A Power Device Measurement System Startup Guide
your way up. The cables labeled 2S (SMU2 Sense) and 2F (SMU2 Force)
connect to the Medium Current SMU2 installed in Slot 3; 3S and 3F
connect to SMU3 in slot 4, etc.
Digital IO Cable
N1300A
CMU Cable
B1506A Rear View: Connect B1506A Test Chamber to the Mainframe
of the B1506A Test Chamber. Refer to the B1506A User Guide, Section 2.
Thermal Platform Controller. See Thermal Platform below.
B1505A with the SAKE system requires at least following hardware options
and setup:
– For H21 (20 A) configuration:
-- MCSMU, MPSMU or HPSMU for gate
-- HVSMU for high-voltage measurement on drain/collector
IV and CV Device Characterization
System Cable
31

Advertisement

Table of Contents
loading

Table of Contents