IV and CV Device Characterization
4 Select the UHC Expander / Fixture tab.
Figure 13 UHC Expander / Fixture tab of Configuration Editor (for B1506A H71)
5 Ensure the following fields are checked or complete:
6 Click the Apply button.
38
-- Enable Ultra Hight Current checkbox is checked.
-- Voltage Control SMU: field is complete.
-- Current Control SMU: field is complete.
-- Enable Selector checkbox is checked.
-- Enable Gate Control checkbox is checked.
-- UHCU: field is complete (confirm after clicking the Apply button).
-- HVSMU: field is complete.
-- SMU: field in both the Input and Gate Control boxes are complete.
-- Thermometer: Channels 1 and 2 are checked
-- Auto Detection: checkbox is checked.
Copy or make a screenshot of the preceding information so that
you can use it later for PD1000A Hardware Configuration and to
configure PD1000A test settings.
Keysight PD1000A Power Device Measurement System Startup Guide
IV and CV Test Requirements