Running the IV and CV Tests

Configure System Hardware

1 Select the IV and CV Measurement Control tab on the left side of the screen.
2 From the Settings menu, select Instrument Configuration for IV and CV
Figure 21 IV and CV Hardware Configuration Editor (for B1506A-H71)
Keysight PD1000A Power Device Measurement System Startup Guide
Measurement Control. Hardware.... Use this dialog to specify the B150xA VISA
address and SMU Module configuration, the InTEST Thermal Platform VISA
addresses, etc.
The B1506A configures the UHCU (Ultra Hight Current Unit) by
using the test chamber and two MCSMUs installed in the
mainframe.
IV and CV Device Characterization