YASKAWA E-S Series Product Manual page 125

Ac, dc power supply input and contact commands
Table of Contents

Advertisement

3.
Set the operating conditions, click the Apply Button, and then click the Run Button.
A graph of the operation pattern will be displayed.
4.
Click the Servo ON Button and then the Execute Button. The program jog operation will
be executed.
This concludes the program jog operation procedure.
6.4 Convenient Function to Use during Trial Operation
6.4.1 Program Jog Operation
6
6-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sgpss servopackSgmsl servomotor

Table of Contents