Cisco TelePresence System TX9000 Assembly, Use & Care, And Field-Replaceable Unit Manual page 80

Table of Contents

Advertisement

Installing Seismic Brackets (Optional), Part Number CTS-TX9K-SEISMIC=
Install the front seismic brackets by completing the following steps:
Step 1
a.
Key Description
1
2
3
Figure 4-14
Position of Front Seismic Bracket
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
4-16
Position one of the two front seismic brackets at an angle to one of the outer-most leveling feet on
the front of the left or right display structure pieces. It is important to position the bracket at an
approximately 50-degree angle to the bottom bar of the display frame. If the bracket is too close to
the bottom bar of the display frame, you will not be able to access the holes in the bracket with a
drill. If the angle from the bottom bar is too wide, the seismic bracket will interfere with the
installation of the rear facade panel. See
seismic bracket.
Rear facade panel
This panel is not yet installed during this stage of the
Note
installation. To see the rear facade panel, see
Figure 14-22
in
of the Main Display Structure."
50-degree angle
Front seismic bracket
Chapter 4
Installing And Performing Initial Leveling of the Main Display Structure
Figure 4-14
Chapter 14, "Completing Installation
for more information on how to position a front
OL-27038-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cts-tx9000Telepresence system tx9200Cts-tx9200

Table of Contents