Chapter 4
Installing And Performing Initial Leveling of the Main Display Structure
Installing and Leveling the Display Structure
Figure 4-10
Attaching Left and Right Displays to the Lower Tie Bar (2 of 2)
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
4-12
OL-27038-01