Cisco TelePresence System TX9000 Assembly, Use & Care, And Field-Replaceable Unit Manual page 70

Table of Contents

Advertisement

Installing and Leveling the Display Structure
Place the left and right display structures in their its correct position in the room, then level the structures
Step 2
using the same procedures as the center structure.
Level the left and right structures relative to the center structure, so that all structures are the same
height.
Note
You can level the structures vertically; however a rough leveling is sufficient, because the vertical
leveling will change after you install the displays onto the structure.
Key Part Description
1
Display stand, center
2
Display stand, left
3
Display stand, right
Figure 4-4
Placing and Leveling the Left and Right Display Structures
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
4-6
Chapter 4
Part/Kit Number
Qty
Ctn
800-37616-01
1
1
Kit #69-2323
800-37615-01
1
1
Kit #69-2323
800-37617-01
1
1
Kit #69-2323
Installing And Performing Initial Leveling of the Main Display Structure
Notes
OL-27038-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cts-tx9000Telepresence system tx9200Cts-tx9200

Table of Contents