Cisco TelePresence System TX9000 Assembly, Use & Care, And Field-Replaceable Unit Manual page 249

Table of Contents

Advertisement

Chapter 13
Building the Second Row Table For a 14- and 10-Seat TX9200 System
Room Sizes and Cable Trench Diagrams
for the thickness of the reflector wall and mount. For free-standing systems that use the minimum
distance between the reflector wall and the wall of the room, add 8" (203 mm). Add more depth if you
plan to install the reflector wall farther away from the rear wall.
Figure 13-2
Cable Trenching (Core Drilling) Measurements for a 14-Seat TX9200 System
There are currently no cable trench diagrams available for a 10-seat TX9200 system. You must run the
power and Ethernet cables on the floor using a cable cover, and use the electrical egress box with a mouse
hole, part number 800-37909-xx.
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
13-3
OL-27038-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cts-tx9000Telepresence system tx9200Cts-tx9200

Table of Contents