Xerox WorkCentre Pro 423 Service Manual page 435

Hide thumbs Also See for WorkCentre Pro 423:
Table of Contents

Advertisement

WorkCentre Pro 423/428
l Accessories for IOT (Figure-3)
 Main Unit
1
 Power Cord
1
 Line Cable
1
 Service Call Log
1 sheet
 User's Guide
1 set
 NVM List (IOT)
1 sheet
 Installation procedure
1 sheet
(Figure-3) j0hn6503
l Accessories for IIT (Figure-4)
 Main Unit
1
 NVM List (IIT)
1
(Figure-4) j0hn6504
2. Peel off packaging tape.
l Check external appearance for dirt, each cover for positioning or for damages.
03/02
6-18
l Remove tapes and packaging materials.
3. Lock the 2-Tray Module casters and place the IOT. (Figure-5)
The weight of the IOT assembly is 46 kg (101 lb). Two persons will be required to lift this
assembly. Use great care when lifting.
1) Press down the levers of the two castors to lock.
2) Lower the IOT by aligning with the pins of the 2Tray Module.
4. Secure the 2-Tray Module and IOT with the accessory brackets (2). (Figure-6)
1) Pull out Tray 2.
2) Hook the brackets in the square holes of the 2-Tray Module.
3) Tighten the Screw.
CHAPTER 6 GENERAL
6.5 Installation
WARNING
(Figure-5) j0hn6505
(Figure-6) j0hn6506

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workcentre pro 428

Table of Contents