Xerox WorkCentre Pro 423 Service Manual page 305

Hide thumbs Also See for WorkCentre Pro 423:
Table of Contents

Advertisement

3. Remove the DADF Feed/Nudger Roll Assembly.
(Figure-2)
1) Remove the KL-clip.
2) Remove the Bearing.
3) Remove the DADF Feed/Nudger Roll Assembly.
(Figure-2) j0hn4a11
4. Remove the DADF Feed Roll. (Figure-3)
1) Remove the KL-Clip (3).
2) Remove the E-Clip.
3) Remove the pins (3).
4) Extract the Shaft.
5) Remove the DADF Feed Roll.
WorkCentre Pro 432/428
(Figure-3) j0hn4a14
Installation
Procedure
1. Perform the removal steps in reverse order with the
following notes in mind.
Note
Install the Feed Roll with the arrow mark
side to the front. (Figure-4)
(Figure-4) j0hn4a15
03/02
4-31
CHAPTER 4 DISASSEMBLY/ASSEMBLY AND ADJUSTMENT
Note
When installing the chute, insert the
projections (2) securely into the Top Cover
holes. (Figure-5)
(Figure-5) j0hn4a13
4.2 Disassembly and Assembly

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workcentre pro 428

Table of Contents