Xerox WorkCentre Pro 423 Service Manual page 287

Hide thumbs Also See for WorkCentre Pro 423:
Table of Contents

Advertisement

3. Install the spring hook side of the Carriage Cable.
(Figure-8)
1) Hook the Cable on the Frame Pulley.
2) Hook the Cable on the Right Pulley of the Half
Rate Carriage.
3) Hook the spring and auxiliary Cable on the
Frame Hook.
4) Secure the Full Rate Carriage on the Cable
temporarily.
(Figure-8) j0hn4315
WorkCentre Pro 432/428
Reference
The Front Carriage Cable is routed as
shown here. (Figure-9)
1) Secure the Full Rate Carriage Cable on the
Cable temporarily.
(Figure-9) j0hn4316
4. Peel off the gummed tape securing the Cable.
5. Adjust the position and parallelism of Full Rate/Half
Rate Carriage. (ADJ 3.4.1)
6. Move the Full Rate Carriage by hand to check its
smooth movement.
03/02
4-13
CHAPTER 4 DISASSEMBLY/ASSEMBLY AND ADJUSTMENT
REP 3.4.1 Exposure Lamp
Ref. PL PL3.4
Removal
On printer or Fax-equipped machines, ensure that
outstanding jobs have cleared before servicing or
interrupting the power to the machine as follows:.
• FAX equipped machines: Ensure that the "Job in
Memory" indicator on the control panel goes out.
Press "Job Status:Stop" button and confirm that the
job has cleared from the "Current Jobs" folder.
• Printer machines: Ensure that "Ready to print or
fax" is indicated on the printer control panel.
WARNING
Switch off the machine and disconnect the
power cord.
Procedure
1. Remove the Platen Glass. (REP3.1.1)
4.2 Disassembly and Assembly

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workcentre pro 428

Table of Contents