Doing A Test Binding; Preparing The Upstream Device - Horizon Fitness Bookletmaker SPF-200A Manual

Table of Contents

Advertisement

3-4

Doing a Test Binding

3-4-1 Preparing the Upstream Device

1
Turn on the power switch on the
upstream device.
- It does not matter which machine is turned
on first.
2
Set up the upstream devices.
- Refer to the user's manual for each device.
ST-40
1.Set up the guides to match the sheet size if
you want to use the faulty set ejecting func-
tion.
2.Turn on the Stitch function.
3. Attach the transport guide.
BC-20
1. Set the horizontal transport conveyor on the
BC-20 to the horizontal position.
2. Set up the faulty set ejecting function.
- When you turn on the faulty set ejecting
function, adjust the stopper on the reject tray
to match the sheet size.
HOF-400/HOF-30/HOF-20
1. Load the sheets.
2. Do a test feed.
Preparing the Upstream Device
Stitch
(Lamp On)
Transport
Guide
11119
30401A1
11119
30401C1
Stopper
The Locking knob is located behind
the stopper.
11119
30401E1
21102
30401F1
Test Feed Button
3-4-1
1 2 3
1 2 3
11119
30401B1
faulty set Ejecting
Function
(Lamp On)
LED
21102
30401D1
2 3 4
53
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents