Long Conveyor - Horizon Fitness Bookletmaker SPF-200A Manual

Table of Contents

Advertisement

7-4
Installing the Delivery Conveyor
7-4-2 LC-200 Long Conveyor
1
Attach the hanger bolts only when
connecting the delivery conveyor
with the SPF main unit.
- This step is unnecessary for the fore-edge
trim section because the hanger bolts are
already attached.
1. Remove the front and rear covers.
2. Attach the hanger bolts.
3. Attach the covers you removed.
2
Attach the legs to the conveyor.
1. Remove the screws attached on the legs.
2. Insert each leg into the bottom of the con-
veyor and tighten the screws.
3
Install the conveyor.
- To install the conveyor, insert the hanger
bolts into the holes on the conveyor.
- Place the rail under the casters.
4
Attach the stack plate.
5
Attach the delivery roller.
- Remove the screw on the end of the roller
bar and then attach the delivery rollers.
6
Plug in the connector for the con-
veyor.
Side of SPF
Main Unit
Connector for
Delivery Con-
veyor
11119
70401G1
146
Back of Fore-edge
Trim Section
11119
70401H1
Nut
Hanger Bolt
Delivery
Rollers
11119
70401D1
Stack
Plate
11119
70402A1
Rail
Caster
7-4-2
LC-200 Long Conveyor
11119
70401B1
11119
70401A1
Roller Bar
Leg
Hanger
Bolt
11119
70401F1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents