Maintenance Schedule - ABB IRB 4600 Foundry Prime Product Manual

Table of Contents

Advertisement

3 Maintenance

3.3.2 Maintenance schedule

3.3.2 Maintenance schedule
General
The robot must be maintained regularly to ensure proper function. The maintenance
activities and intervals are specified in the table below.
Non-predictable situations also give rise to inspections of the robot. Any damages
must be attended to immediately!
The inspection intervals do not specify the life of each component.
Values for these are specified in the section
Activities and intervals, Foundry Prime
The following table specifies the required maintenance activities and intervals for
robots with protection type Foundry Prime.
Maintenance activ-
ity
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Replacement
Inspection
Inspection
Inspection
Inspection
Continues on next page
110
Note
For best reliability, it is of highest importance that the special maintenance
instructions for the Foundry Prime robot are followed and documented.
Equipment
Oil level in axis-1 gearbox
Oil level in axis-2 gearbox
Oil level in axis-3 gearbox
Oil level in axis-4 gearbox
Oil level in axis-5 gearbox
Oil level in axis-6 gearbox
Surface treatment
Cable harness
(Including rubber blocks and straps)
Cable harness
Air hoses
Information labels
Dampers
Mechanical stop, axis 1
© Copyright 2013-2018 ABB. All rights reserved.
Expected component life on page 112
Interval
Every:
6 months
Every:
6 months
Every:
6 months
Every:
6 months
Every:
6 months
Every:
6 months
Every:
6 months
Every:
6 months
ii
If required
ii
If required
Every:
6 months
Every:
12 months
Every:
12 months
Every:
12 months
Product manual - IRB 4600 Foundry Prime
3HAC040585-001 Revision: M
i

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents