ABB IRB 4600 Foundry Prime Product Manual page 229

Table of Contents

Advertisement

16
17
18
19
20
21
Product manual - IRB 4600 Foundry Prime
3HAC040585-001 Revision: M
Action
Secure the battery cable with cable straps.
Use caution when pushing the base cover
into position while at the same time check-
ing that no cables are damaged.
Secure the base cover with its attachment
screws.
Refit the bracket on the frame.
Refit the cable straps securing the cable
harness to the frame.
Continue the refitting of the cable package
on lower arm and armhouse.
© Copyright 2013-2018 ABB. All rights reserved.
4.3.2 Refitting the complete cable harness
Note
xx0900000099
Parts:
A: Cable straps (2 pcs)
xx0800000456
Parts:
A: Base
B: Base cover
C: Attachment screws (6 pcs)
See the figure in:
Location of the cable harness on
page 218
See the figure in:
Location of the cable harness on
page 218
How to refit the cable harness on the
lower arm and armhouse is described in
section:
Refitting the cable harness in the
lower arm and armhouse on
page 230
Continues on next page
4 Repair
Continued
A
B
C
229

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents