Advanced commissioning
6.8 Safe Torque Off (STO) safety function
Reduced acceptance test after function expansions
A full acceptance test is necessary only after first commissioning. A reduced acceptance test
is sufficient when safety functions are expanded.
Measure
Functional expansion of the ma-
chine (additional drive).
Transfer of inverter settings to
other identical machines by means
of series commissioning.
Documents for acceptance
The STARTER provides you with a number of documents to be regarded as a
recommendation for the acceptance tests of the safety functions.
254
Acceptance test
Acceptance test
Documentation
Yes.
•
Only check the safety
•
functions of the new
•
drive.
•
•
No.
•
Only check the control
•
of all of the safety
•
functions.
Distributed converter for SIMOGEAR geared motors
Operating Instructions, 06/2016, FW V4.7.6, A5E31298649B AG
Supplement machine overview
Supplement inverter data
Add function table
Log the new checksums
Countersignature
Add machine description
Check checksums
Check firmware versions