Chrysler Sebring 2005 Service Manual page 1712

Jr
Hide thumbs Also See for Sebring 2005:
Table of Contents

Advertisement

JR
INPUT CLUTCH ASSEMBLY (Continued)
(10) Install the UD clutch pack. Leave out upper
disc, until snap ring is installed (Fig. 245).
Fig. 245 Underdrive Clutch Pack
1 - CLUTCH PLATE
2 - ONE UD CLUTCH DISC
3 - CLUTCH DISC
(11) Install the UD clutch flat snap ring (Fig. 246).
Fig. 246 UD Clutch Flat Snap Ring
1 - UNDERDRIVE CLUTCH REACTION PLATE FLAT SNAP RING
2 - SCREWDRIVER
(12) Install the last UD clutch disc (Fig. 247).
41TE AUTOMATIC TRANSAXLE
Fig. 247 Install Last UD Clutch Disc
1 - ONE UNDERDRIVE CLUTCH DISC
(13) Install the OD/UD clutch reaction plate and
snap ring (Fig. 248) (Fig. 249). The OD/UD clutches
reaction plate has a step on both sides. Install the
OD/UD clutches reaction plate tapered step side up.
Fig. 248 OD/UD Reaction Plate
1 - OD/UD CLUTCH REACTION PLATE (TAPERED STEP SIDE
UP)
NOTE: Snap ring ends must be located within one
finger of the input clutch hub. Be sure that snap
ring is fully seated, by pushing with screwdriver,
into snap ring groove all the way around.
(14) Seat tapered snap ring to ensure proper
installation (Fig. 250) (Fig. 251).
21 - 301

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2005Stratus 2005

Table of Contents