Chrysler Sebring 2005 Service Manual page 2190

Jr
Hide thumbs Also See for Sebring 2005:
Table of Contents

Advertisement

JR
MASS AIR FLOW SENSOR (Continued)
(4) Install the bracket assembly (Fig. 19).
(5) Install 2 bracket mounting bolts (Fig. 20).
(6) Install the air pump assembly, (Refer to 25 -
EMISSIONS CONTROL/AIR INJECTION/PUMP -
INSTALLATION)
Fig. 19
Fig. 20
(7) Connect negative battery cable.
AIR INJECTION
25 - 35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2005Stratus 2005

Table of Contents