Chrysler Sebring 2005 Service Manual page 1312

Jr
Hide thumbs Also See for Sebring 2005:
Table of Contents

Advertisement

JR
EXHAUST SYSTEM (Continued)
INSPECTION
Inspect the exhaust pipes, catalytic converters,
muffler, and resonators for cracked joints, broken
welds and corrosion damage that would result in a
leaking exhaust system. Inspect the clamps, support
brackets, and insulators for cracks and corrosion
damage.
NOTE: Slip joint band clamps are spot welded to
exhaust system. If a band clamp must be replaced,
the spot weld must be ground off.
INSTALLATION - EXHAUST SYSTEM
NOTE: Always work from the front to rear of
exhaust system when aligning and tightening
exhaust system components.
(1) Loosely install fasteners that attach exhaust
system to exhaust manifold (2.0L/2.4L)/cross-under
pipe (2.7L).
(2) Install support isolators to muffler supports.
(3) Align exhaust system to maintain position and
proper clearance with underbody parts. All support
isolators should have equal load on them. Tighten
fasteners that attach exhaust system to exhaust
manifold (2.0L/2.4L)/cross-under pipe (2.7L) to 28
N·m (250 in. lbs.).
(4) Vehicles equipped with 2.0L/2.4L engines,
reconnect the downstream oxygen sensor connector.
(5) Connect ground strap to muffler.
(6) Lower vehicle.
(7) Start the engine and inspect for exhaust leaks.
Repair exhaust leaks as necessary.
(8) Check the exhaust system for contact with the
body panels. Make the necessary ajustments, if
needed.
ADJUSTMENTS
A misaligned exhaust system is usually indicated
by a vibration, rattling noise, or binding of exhaust
system components. These noises are sometimes hard
to distinguish from other chassis noises. Inspect
exhaust system for broken or loose clamps, heat
shields, isolators, and brackets. Replace or tighten as
necessary. It is important that exhaust system clear-
ances and alignment be maintained.
Perform the following procedures to align the
exhaust system:
(1) Loosen clamps and support brackets.
(2) Align the exhaust system starting at the front,
working rearward.
(3) Tighten all clamps and brackets once align-
ment and clearances are achieved.
SPECIFICATIONS
TORQUE
DESCRIPTION
Band Clamps—Fastener
Body Heat Shield—Fasteners
Catalytic Converter to Exhaust
Manifold Flange—Fasteners
Cross-Under Pipe —Fasteners (2.7L)
SPECIAL TOOLS
EXHAUST SYSTEM
DRB III & PEP Module - OT-CH6010A
Back Pressure Test Adapter - CH8519
Pressure Transducer CH7063
EXHAUST SYSTEM
N·m
Ft.
Lbs.
54
40
5
28
28
11 - 5
In.
Lbs.
40
250
250

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2005Stratus 2005

Table of Contents