Installation - 4 Cylinder - Chrysler Sebring 2005 Service Manual

Jr
Hide thumbs Also See for Sebring 2005:
Table of Contents

Advertisement

JR
VALVE (Continued)
(1) Disconnect the negative battery cable.
(2) Remove the air cleaner box.
(3) Remove the 2 bolts EGR tube to EGR valve
(Fig. 5).
Fig. 5 EGR VALVE ASSEMBLY
(4) Remove the 2 bolts for EGR valve to cylinder
head.
EXHAUST GAS RECIRCULATION
(5) Disconnect the electrical connector from sole-
noid.
(6) Remove the EGR valve as an assembly
(7) Clean gasket surfaces. Discard old gasket. If
necessary, clean EGR passages.

INSTALLATION - 4 CYLINDER

(1) Clean surfaces of cylinder head and EGR tube
where EGR valve interfaces.
(2) Install new gasket between the EGR valve and
the transducer to cylinder head and loose install
bolts.
(3) Install the 2 bolts from EGR tube to EGR
valve.
(4) Tighten the EGR valve to cylinder head bolts to
22.9 N·m (202 in. lbs.).
(5) Tighten the EGR tube to EGR valve bolts to
11.3 N·m (100 in. lbs.).
(6) Connect the electrical connector to EGR trans-
ducer.
(7) Connect the vacuum hose to EGR transducer.
(8) Install the air cleaner box.
(9) Connect the negative battery cable.
25 - 23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2005Stratus 2005

Table of Contents