Chrysler Sebring 2005 Service Manual page 1305

Jr
Hide thumbs Also See for Sebring 2005:
Table of Contents

Advertisement

9 - 236
ENGINE 2.7L DOHC
TIMING CHAIN AND SPROCKETS (Continued)
1 - TENSIONER
2 - CHECK BALL
(24) Install the timing chain cover, crankshaft
vibration damper, and cylinder head covers. (Refer to
9 - ENGINE/VALVE TIMING/TIMING BELT /
CHAIN COVER(S) - INSTALLATION) (Refer to 9 -
ENGINE/ENGINE BLOCK/VIBRATION DAMPER -
INSTALLATION) (Refer to 9 - ENGINE/CYLINDER
HEAD/CYLINDER HEAD COVER(S) - INSTALLA-
TION)
(25) Install upper intake manifold. (Refer to 9 -
ENGINE/MANIFOLDS/INTAKE
INSTALLATION)
Fig. 121 TIMING CHAIN TENSIONER - OIL PURGING
MANIFOLD
3 - SPECIAL TOOL 8186
4 - PIN
NOTE: After installation of a reset tensioner, engine
noise will occur after initial start-up. This noise will
normally disappear within 5–10 seconds.
(26) Fill cooling system (Refer to 7 - COOLING/
ENGINE - STANDARD PROCEDURE).
(27) Connect negative battery cable.
-
JR

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2005Stratus 2005

Table of Contents