Subaru Legacy 2003 Service Manual page 3363

Hide thumbs Also See for Legacy 2003:
Table of Contents

Advertisement

POWER ASSISTED SYSTEM (POWER STEERING)
27) Inspect gearbox as follows:
"A" Holding tie-rod end, repeat lock to lock two or
three times as quickly as possible.
"B" Holding tie-rod end, turn it slowly at a radius one
or two times as large as possible.
After all, make sure that boot is installed in the
specified position without deflation.
28) Remove gearbox from ST.
ST 926200000
STAND
29) Install four pipes on gearbox.
(1) Connect pipes A and B to four pipe joints of
gearbox. Connect upper pipe B first, and lower
pipe A.
Tightening torque:
13 N·m (1.3 kgf-m, 9.4 ft-lb)
(2) Connect pipes C and D to gearbox.
Connect lower pipe C first, and upper pipe D
second.
Tightening torque:
15 N·m (1.5 kgf-m, 10.8 ft-lb)
( 1 )
(1) Pipe C
(2) Pipe D
2. CONTROL VALVE ASSEMBLY
Specified steering grease:
VALIANT GREASE M2 (Part No.
003608001)
1) Clean all parts and tools before reassembling.
STEERING GEARBOX [LHD MODEL]
A
B
PS-00098
( 2 )
PS-00205
PS-42
2) Apply a coat of specified power steering fluid to
inner wall of valve housing.
3) Attach ST2 to ST1, and press oil seal into place
using a press.
ST1 34099FA120 INSTALLER & REMOVER
SEAL
ST2 34099FA130 INSTALLER SEAL
(1) Face oil seal in the direction shown in figure
when installing.
(2) To avoid scratching oil seal, apply a coat of
grease to contact surface of installer and oil
seal.
(3) To facilitate installation, attach oil seal to in-
staller and position in valve housing before
pressing into place.
4) Put vinyl tape around pinion shaft splines to pro-
tect oil seal from damage.
Fluid
PS-00285
ST1
ST2
PS-00286

Advertisement

Table of Contents
loading

Table of Contents