Groen CC20-E Operator's Manual page 278

Hide thumbs Also See for CC20-E:
Table of Contents

Advertisement

Maintenance
Replacement Procedures
Door Handle and Door Cam
1. Turn off oven power.
2. Allow oven to cool.
3. Remove screws (1) and U-channel (2) from the door.
4. Remove screws (3), door handle (4), and cam (5).
Installation
1. Apply a high temperature (1800°F) anti-seize and lubricating
compound to the door cam (5) and Loctite 242 to screw (3) threads.
2. Assemble door cam (5) to handle (4) with screws (3).
3. Be sure door handle is in the down position. Hold U-channel
door spring open with a screwdriver or similar tool, then install
the U-channel (2). Do not install screws (1) at this time.
4. Check operation of the cam and door spring. Push up on the
door handle and check if spring opens. If the spring does not
open, the cam and spring are not correctly aligned and the
problem must be corrected.
5. Apply a light amount of Loctite 242 to screws (1), then install
screws (1).
8-34
(Revised 1/02)

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CC20-E and is the answer not in the manual?

This manual is also suitable for:

Cc10-eC/2gCc10-gCc20-gC/2-e

Table of Contents

Save PDF