Groen CC20-E Operator's Manual page 269

Hide thumbs Also See for CC20-E:
Table of Contents

Advertisement

Maintenance
Replacement Procedures
Relay Board
Installation
(continued)
6. Correctly connect leads 11131 (5) and RB2 (6).
7. Connect door switch leads to terminals (3 and 4).
8. Connect relay board harness (2) to control panel.
9. Check for continuity to ground at ground pad (11).
10. Correctly connect relay wires to relays (1).
11. Connect oven to the branch circuit and operate oven. Check that all touch pad
and status lights are illuminated for the selected mode of operation.
12. Install right side panel.
(Revised 1/02)
8-25

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CC20-E and is the answer not in the manual?

This manual is also suitable for:

Cc10-eC/2gCc10-gCc20-gC/2-e

Table of Contents

Save PDF