Nqa Collaboration Configuration Example - HPE FlexNetwork 5510 HI Series Network Management And Monitoring Configuration Manual

Hide thumbs Also See for FlexNetwork 5510 HI Series:
Table of Contents

Advertisement

Hop IP 10.1.1.2
Basic Results
Send operation times: 10
Min/Max/Average round trip time: 9/21/14
Square-Sum of round trip time: 2419
Extended Results
Failures due to timeout: 0
Failures due to internal error: 0
Failures due to other errors: 0
Packets out of sequence: 0
Packets arrived late: 0
Path-Jitter Results
Jitter number: 9
Min/Max/Average jitter: 1/10/4
Positive jitter number: 6
Min/Max/Average positive jitter: 1/9/4
Sum/Square-Sum positive jitter: 25/173
Negative jitter number: 3
Min/Max/Average negative jitter: 2/10/6
Sum/Square-Sum positive jitter: 19/153
Hop IP 10.2.2.2
Basic Results
Send operation times: 10
Min/Max/Average round trip time: 15/40/28
Square-Sum of round trip time: 4493
Extended Results
Failures due to timeout: 0
Failures due to internal error: 0
Failures due to other errors: 0
Packets out of sequence: 0
Packets arrived late: 0
Path-Jitter Results
Jitter number: 9
Min/Max/Average jitter: 1/10/4
Positive jitter number: 6
Min/Max/Average positive jitter: 1/9/4
Sum/Square-Sum positive jitter: 25/173
Negative jitter number: 3
Min/Max/Average negative jitter: 2/10/6
Sum/Square-Sum positive jitter: 19/153

NQA collaboration configuration example

Network requirements
As shown in
A. Associate the static route, a track entry, and an ICMP echo operation to monitor the state of the
static route.
Figure
50, configure a static route to Switch C with Switch B as the next hop on Switch
Receive response times: 10
Receive response times: 10
146

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents