Mounting bracket kits ··············································································································································· 8 Rack-mounting by using front mounting brackets ·································································································· 9 Rack-mounting by using front and rear mounting brackets (HPE 5510 24G PoE+ 4SFP+ HI and HPE 5510 48G PoE+ 4SFP+ HI) ············································································································································ 11 Mounting the switch on a workbench ·························································································································· 14 Grounding the switch ····················································································································································...
Page 4
Garbled terminal display ······································································································································ 44 Appendix A Chassis views and technical specifications ··························································································· 46 Chassis views ································································································································································· 46 HPE 5510 24G SFP 4SFP+ HI ····························································································································· 46 HPE 5510 24G 4SFP+ HI ···································································································································· 47 HPE 5510 24G PoE+ 4SFP+ HI ·························································································································· 48 HPE 5510 48G 4SFP+ HI ····································································································································...
Page 5
Appendix D Cooling system ········································································································································· 69 Index ················································································································································································ 70...
HPE 5130/5510 10GbE SFP+ 2-port Module LSWM2SP2PM For regulatory identification purposes, the HPE 5510 HI switches are assigned regulatory model numbers (RMNs), which are listed in the following table. These regulatory numbers should not be confused with the marketing names HPE 5510 HI, or the product codes.
Before cleaning the switch, remove all power cords from the switch. Do not clean the switch with wet cloth or liquid. Do not place the switch near water or in a damp environment. Prevent water or moisture from entering the switch chassis.
Cleanliness Dust buildup on the chassis might result in electrostatic adsorption, which causes poor contact of metal components and contact points, especially when indoor relative humidity is low. In the worst case, electrostatic adsorption can cause communication failure. Table 2 Dust concentration limit in the equipment room Substance Concentration limit (particles/m³) Dust...
All HPE 5510 HI switches screws) Rear mounting bracket kit (including one pair of mounting brackets and two HPE 5510 24G PoE+ 4SFP+ 1-slot HI load-bearing screws) 5190-0297 1 kit HPE 5510 48G PoE+ 4SFP+ 1-slot HI M6 screw and floating nut...
Page 10
Product Description Quantity Applicable models code HPE 5510 24G SFP 4SFP+ HI Power supply filler panel HPE 5510 24G PoE+ 4SFP+ HI 5190-1774 HPE 5510 48G PoE+ 4SFP+ HI Interface card filler panel 5190-0296 All HPE 5510 HI switches...
CAUTION: Keep the tamper-proof seal on a mounting screw on the chassis cover intact, and if you want to open the chassis, contact HPE for permission. Otherwise, HPE shall not be liable for any consequence. Figure 1 Hardware installation flow...
Installing the switch in a 19-inch rack Installation accessories Table 5 Installation accessories for the HPE 5510 HI switches Installati Chassis Installation requirements Installation procedure accessori HPE 5510 24G 4SFP+ HI Front The mounting bracket kit can be "Rack-mounting by ...
Determine the mounting position on the switch for the front mounting brackets. You can install the front mounting brackets at one of the following positions: HPE 5510 24G SFP 4SFP+ HI, HPE 5510 24G 4SFP+ HI, and HPE 5510 48G 4SFP+ HI ...
Page 15
Figure 8 Attaching the front mounting bracket to the mid-mounting position Mount the chassis in the rack: One person supports the chassis bottom with one hand, holds the front part of the chassis with the other hand, and pushes the chassis into the rack gently The other person uses M6 screws and cage nuts (user supplied) to attach the switch to the rack.
5510 24G PoE+ 4SFP+ HI and HPE 5510 48G PoE+ 4SFP+ This mounting method is applicable to only the HPE 5510 24G PoE+ 4SFP+ HI and HPE 5510 48G PoE+ 4SFP+ HI switches. You can install the front mounting brackets at the port-side or power-side mounting...
Page 17
position as needed. The following takes port-side mounting as an example. The power-side mounting is similar. This task requires two people. To install the switch in a 19-inch rack by using the front and rear mounting brackets: Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded. Attach the front mounting brackets and load-bearing screws to the chassis: Unpack the front mounting brackets and the M4 screws for attaching the brackets to the switch chassis.
Page 18
Figure 13 Attaching the rear mounting brackets to a rack Mount the switch chassis in the rack: One person supports the chassis bottom with one hand, holds the front part of the chassis with the other hand, and pushes the chassis into the rack gently. Make sure the load-bearing screws closely contact with the upper edges of the rear mounting brackets, as shown in Figure...
Figure 14 Mounting the switch in the rack Mounting the switch on a workbench IMPORTANT: Ensure good ventilation and 10 cm (3.9 in) of clearance around the chassis for heat dissipation. Avoid placing heavy objects on the switch. To mount the switch on a workbench: Verify that the workbench is sturdy and reliably grounded.
(4) Grounding hole (5) Grounding cable Connecting the grounding cable to a grounding strip (for the HPE 5510 24G PoE+ 4SFP+ HI and HPE 5510 48G PoE+ 4SFP+ HI switches) Remove the hex nut of a grounding post on the grounding strip.
Page 21
(3) Grounding cable (4) Hex nut Connecting the grounding cable to a grounding strip (for the HPE 5510 24G 4SFP+ HI, HPE 5510 48G 4SFP+ HI, and HPE 5510 24G SFP 4SFP+ HI switches) Remove the hex nut of a grounding post on the grounding strip.
Figure 18 Connecting the grounding cable to a grounding strip (1) Grounding post (2) Grounding strip (3) Grounding cable (4) Hex nut Grounding the switch with a grounding conductor buried in the earth ground If the installation site has no grounding strips, but earth ground is available, hammer a 0.5 m (1.64 ft) or longer angle iron or steel tube into the earth ground to serve as a grounding conductor.
Grounding the switch by using the AC power cord If the installation site has no grounding strips or earth ground, you ground an AC-powered switch through the PE wire of the power cord. Make sure: The power cord has a PE terminal. ...
Installing/removing a power supply WARNING! In power redundancy mode, you can replace a power supply without powering off the switch but you must strictly follow the installation and procedures in Figure 21 Figure 22 to avoid any bodily injury or damage to the switch.
Figure 23 Installing a PSR150-A1 power supply NOTE: If the power supply slot where you want to install a power supply is covered by a filler panel, remove the filler panel first. To do so, use a Phillips screwdriver to remove the screws, as shown in Figure Figure 24 Removing the filler panel Removing a PSR150 power supply...
Install the filler panel to prevent dust and ensure good ventilation if no power supply is installed in the slot. Installing a PSR720-56A/PSR1110-56A power supply CAUTION: To prevent damage to the power supply or the connectors on the backplane, insert the power supply gently.
Figure 26 PSR1110-56A in the chassis Removing a PSR720-56A/PSR1110-56A power supply Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded. Disconnect the power cord. Press the latch towards the handle, and pull the power supply along the guide rails until it is part-way out.
PSR150-A1 Connecting the PSR150-D1 power supply WARNING! HPE DC power cords are required if the –48 VDC power source is used. RPS power cords are required if the RPS power source is used. Identify the positive (+) and negative (-) marks on the two wires to avoid connection mistakes.
Figure 28 Connecting the PSR150-D1 power supply Connecting the PSR720-56A/PSR1110-56A/PSR150-A1 power supply The procedure is similar for connecting a PSR720-56A, PSR1 1 10-56A, or PSR150-A1 power supply. The following uses the PSR720-56A power supply as an example. To connect the PSR720-56A power supply: Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded.
Figure 29 Connecting a PSR720-56A power supply Installing/removing an interface card CAUTION: Do not touch the surface-mounted components on an interface card directly with your hands. Do not use excessive force during the installation or removal procedure. Install a filler panel over an empty interface card slot. ...
Page 31
Figure 30 Removing the filler panel over an interface card slot Unpack the interface card. (Optional.) Rotate out the ejector lever. Gently push the interface card in along the guide rails until the interface card has good contact with the switch chassis (Optional.)Rotate in the ejector lever.
Figure 31 Installing an interface card with an ejector lever Removing an interface card Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded. Use a Phillips screwdriver to completely loosen the captive screw on the interface card. Rotate rightward the ejector lever on the interface card.
Page 33
The correct power source is used. The power cords are correctly connected. All the interface cables are cabled indoors. If any cable is routed outdoors, verify that the socket strip with lightning protection and lightning arresters for network ports have been correctly connected.
Setting up the configuration environment You can access the HPE 5510 HI switch through the serial port or the mini USB port. HPE recommends that you access the switch through the serial port by using the provided console cable. To access the switch through the mini USB port, you need to prepare the mini USB console cable.
RJ-45 Signal DB-9 Signal To connect a terminal (for example, a PC) to the switch: Plug the DB-9 female connector of the console cable to the serial port of the PC. Connect the RJ-45 connector to the console port of the switch. NOTE: ...
Page 36
Figure 34 Device Driver Installation Wizard Click Continue Anyway if the following dialog box appears. Figure 35 Software Installation Click Finish.
Figure 36 Completing the device driver installation wizard Setting terminal parameters To configure and manage the switch through the console port, you must run a terminal emulator program, HyperTerminal or PuTTY, on your configuration terminal. You can use the emulator program to connect a network device, a Telnet site, or an SSH site.
Page 38
After the startup completes, you can access the CLI to configure the switch. For more information about the configuration commands and CLI, see HPE 5510 HI Switch Series Configuration Guides and HPE 5510 HI Switch Series Command References.
Setting up an IRF fabric You can use HPE IRF technology to connect and virtualize HPE 5510 HI switches into a large virtual switch called an "IRF fabric" for flattened network topology, and high availability, scalability, and manageability. IRF fabric setup flowchart...
center. NOTE: For the maximum IRF member devices supported by the HPE 5510 HI, see the release notes that come with the switch. Identifying the master switch and planning IRF member IDs Determine which switch you want to use as the master for managing all member switches in the IRF fabric.
1 on one switch to the physical ports of IRF-port 2 on the other switch. The HPE 5510 HI switches can provide 10-GE IRF connections through SFP+ ports and 40-GE IRF connections through QSFP+ ports, and you can bind several SFP+/QSFP+ ports to an IRF port for increased bandwidth and availability.
If the IRF member switches are all in one equipment room, choose SFP+/QSFP+ DAC cables. For more information about SFP+/QSFP+ DAC cables and SFP+/QSFP+ transceiver modules, see "Appendix C Ports and LEDs." The following subsections describe several HPE recommended IRF connection schemes, and all these schemes use a ring topology.
Page 43
IMPORTANT: In these schemes, all physical IRF ports are located on the same side. If physical IRF ports are on different sides, you must measure the distance between them to select an appropriate cable. Connecting the IRF member switches in one rack Use SFP+ DAC cables to connect the IRF member switches (9 switches in this example) in a rack as shown Figure 40.
Page 44
Figure 40 Connecting the switches in one rack...
Execute the display irf configuration command to verify the basic IRF settings. For more information about configuring basic IRF settings, see HPE 5510 HI Switch Series IRF Configuration Guide. Connecting the physical IRF ports Use SFP+/QSFP+ DAC cables or SFP+/QSFP+ transceiver modules and fibers to connect the IRF...
Create a Layer 3 interface, assign it an IP address, and make sure the IRF fabric and the remote network management station can reach each other. Use Telnet, web, or SNMP to access the IRF fabric from the network management station. (See HPE 5510 HI Switch Series Fundamentals Configuration Guide.) Verify that you can manage all member switches as if they were one node.
The power supply status LEDs are not steady green. For the HPE 5510 24G SFP 4SFP+ HI, HPE 5510 24G 4SFP+ HI, and HPE 5510 48G 4SFP+ HI, examine the PWR1 or PWR2 LED of the switch to identify power supply failure.
Removing a fan tray WARNING! Do not touch any naked conductors or terminals on the fan tray. Do not place the fan tray in moist place. Prevent liquid from entering the fan tray. Do not disassemble faulty fan trays yourself. When the internal wiring or components of a fan tray are ...
Verify that the power supply is supplying power to the switch. Verify that the console cable is correctly connected. Verify that the console cable does not have any problems and the terminal settings are correct. If the problem persists, contact HPE Support. Garbled terminal display Symptom...
Page 50
Solution To resolve the problem: Verify that the following settings are configured for the terminal: Baud rate—9,600. Data bits—8. Parity—none. Stop bits—1. Flow control—none. If the problem persists, contact HPE Support.
(6) Power supply 2 The HPE 5510 24G SFP 4SFP+ HI switch comes with power supply slot 1 empty and power supply slot 2 installed with a filler panel. You can install one or two power supplies for the switch as required. In this...
"Installing/removing a power supply." The HPE 5510 24G SFP 4SFP+ HI switch comes with a filler panel in the interface card slot. You can select an interface card for the switch as required. In this figure, an LSWM2SP2PM interface card is installed in the interface card slot.
"Installing/removing a ." The HPE 5510 24G PoE+ 4SFP+ HI switch comes with a filler panel in the interface card slot. You can select an interface card for the switch as required. In this figure, an LSWM2SP2PM interface card is installed in the interface card slot.
The HPE 5510 48G 4SFP+ HI switch comes with a filler panel in the interface card slot. You can select an interface card for the switch as required. In this figure, an LSWM2SP2PM interface card is installed in the interface card slot.
"Installing/removing a power supply." The HPE 5510 48G PoE+ 4SFP+ HI switch comes with a filler panel in the interface card slot. You can select an interface card for the switch as required. In this figure, an LSWM2SP2PM interface card is installed in the interface card slot.
Technical specifications Table 11 Technical specifications for non-PoE switch models HPE 5510 24G 4SFP+ Item HPE 5510 24G SFP 4SFP+ HI HPE 5510 48G 4SFP+ HI 43.6 × 440 × 360 mm Dimension 43.6 × 440 × 360 mm 43.6 × 440 × 360 mm s (H ×...
Page 57
HPE 5510 24G 4SFP+ Item HPE 5510 24G SFP 4SFP+ HI HPE 5510 48G 4SFP+ HI You can use the site –48 VDC power source or an RPS800-A or RPS1600-A RPS as the DC power source. Single AC input: 55 ...
Page 58
0°C to 45°C (32°F to 113°F) temperature Relative humidity 5% to 95%, noncondensing Fire resistance UL60950-1, EN60950-1, IEC60950-1, GB4943 compliance The following table describes PoE power capacity for the HPE 5510 24G PoE+ 4SFP+ HI and HPE 5510 48G PoE+ 4SFP+ HI switches:...
Page 59
HPE 5510 24G PoE+ 4SFP+ HI HPE 5510 48G PoE+ 4SFP+ HI Power supply Total PoE Max PoE power Total PoE power Max PoE power configuration power capacity capacity per port capacity capacity per port Two PSR1110-56A 740 W 30 W...
You can install one power supply, or two power supplies for redundancy on the HPE 5510 24G 4SFP+ HI, HPE 5510 24G SFP 4SFP+ HI, and HPE 5510 48G 4SFP+ HI switches. These switches support mix of an AC power supply and a DC power supply.
150 W Rated input voltage range: –48 VDC to –60 VDC input voltage range: HPE PSR150-A & PSR150-D Power PSR150-D1 –36 VDC to –72 VDC Supplies User Guide output power: 150 W Rated input voltage...
Interface card operating mode On the HPE 5510 48G 4SFP+ HI and HPE 5510 48G PoE+ 4SFP+ HI switches, you can use the port-configuration-mode command to configure one of the following operating modes for an interface card. 0—All ports on the interface card are not available.
Appendix C Ports and LEDs Ports Console port The switch has two console ports: a serial console port and a USB mini console port. Table 14 Console port specifications Item Console port USB mini console port Connector type RJ-45 USB mini-Type B Compliant standard EIA/TIA-232 USB 2.0...
Standards IEEE 802.3i, 802.3u, 802.3ab 100/1000Base-X SFP port The HPE 5510 24G SFP 4SFP+ HI switch provides 24 fixed SFP ports on the front panel. You can install the 100 Mbps SFP modules in Table 17 and the 1000 Mbps SFP transceiver modules in...
Transceiver NOTE: To guarantee the functionality of the SFP ports, use only HPE SFP transceiver modules. The SFP transceiver modules available for the switch are subject to change over time. For the most up-to-date list of SFP transceiver modules, consult your HPE sales representative or technical support engineer.
Page 66
Central Modal Product Cable/fiber wavelength Connector bandwidth transmission code description diameter (µm) (nm) (MHz × km) distance HP X125 1G Single-mode, 70 km (43.50 JD063B SFP LC LH70 1550 9/125 miles) Transceiver HP X120 1G Single-mode, 100 km JD103A SFP LC LH100 1550 9/125 (62.14 miles)
Figure 55 SFP+ DAC cable (1) Connector (2) Pull latch NOTE: To guarantee the functionality of the SFP+ ports, use only HPE SFP/SFP+ transceiver modules and SFP+ DAC cables. The SFP/SFP+ transceiver modules and SFP+ DAC cables available for the switch are subject to change over time.
Page 68
150 m SR4 XCVR 4700 (492.12 ft) Table 22 QSFP+ DAC cables available for the QSFP+ ports Product code HPE description Max transmission distance JG326A HP X240 40G QSFP+ QSFP+ 1m DAC Cable 1 m (3.28 ft) JG327A HP X240 40G QSFP+ QSFP+ 3m DAC Cable 3 m (9.84 ft)
(3) SFP+ side pull tab (4) SFP+ module NOTE: HPE recommends that you use HPE QSFP+ transceiver modules, QSFP+ DAC cables, or QSFP+ to 4 x SFP+ DAC cables for the QSFP+ ports on the switch. The HPE QSFP+ transceiver modules, QSFP+ DAC cables, and QSFP+ to 4 x SFP+ DAC cables available for the interface cards are subject to change over time.
No power supply is installed in power supply slot 2. Port mode LED To show more information about the switch through the port status LEDs, all HPE 5510 HI switches provides a port mode LED. The port mode LED indicates the type of information that the network port LEDs are showing.
ID of the switch is 5. 100/1000Base-X SFP port LED On the HPE 5510 24G SFP 4SFP+ HI switch, an SFP port LED in conjunction with the port mode LED indicates the operating state of the SFP port. Table 28 100/1000Base-X SFP port LED description...
Port mode LED SFP pPort LED Description (Mode) status status A link is present on the port and tThe port is operating at 100 Steady yellow Mbps. The port LED fast flashes when the port is sending or receiving data. Flashing yellow The port is sending or receiving data at 100 Mbps.
Interface card status LED The HPE 5510 24G 4SFP+ HI, HPE 5510 48G 4SFP+ HI, HPE 5510 24G SFP 4SFP+ HI, HPE 5510 24G PoE+ 4SFP+ HI, and HPE 5510 48G PoE+ 4SFP+ HI switches provide an interface card slot at the rear.
Figure Figure 58 Airflow through the HPE 5510 24G 4SFP+ 1-slot HI switch (1) Power supply air vents (2) Fan tray air vents...
Page 75
Index Numerics switch, troubleshooting configuration terminal problems, 10/100/1000 Base-T autosensing Ethernet combo interface, verify the IRF fabric setup, 41, port, connecting port LED, console cable, 19-inch rack first time switch access, mounting bracket kit, IRF member switches in a ToR solution, switch installation, IRF member switches in one rack, IRF physical ports,...
Page 76
grounding switch through AC power cord, EMI prevention, grounding switch with a grounding conductor grounding conductor buried in the earth ground, buried in the earth ground, grounding switch with grounding strip, grounding strip, grounding the switch, switch, power supply, switch through AC power cord, power supply removal, switch with a grounding conductor buried in the earth ground,...
Page 77
PSR720-56A/PSR1110-56A power supply Interface card removal, status LED, QSFP+ port technical specifications, interface card SFP port LED, installation, 25, SFP port technical specifications, removal, SFP+ port LED, interface card status LED, SFP+ port technical specifications, IRF fabric switch installation, 1, configuring basic settings, switch installation in 19-inch rack, connecting member switches in a ToR solution,...
Page 78
configuring IRF basic settings, connecting PSR720-56A/PSR1110-56A/PSR150-A1, IRF fabric, failure (troubleshooting), member grounding switch through AC power cord, configuring IRF member switch basic settings, input status LED, connecting IRF physical ports, installation, identifying IRF member switch physical ports, output status LED, removal, IRF member ID, technical specifications,...
Page 79
removing PSR720-56A/PSR1110-56A power installation site gas saturation, supply, installation site humidity, setting up IRF fabric, installation site temperature, troubleshooting fan failure, laser safety recommendations, troubleshooting garbled terminal display, setting troubleshooting hot swappable fan failure, IRF fabric, troubleshooting no terminal display, switch configuration environment, troubleshooting power supply failure, terminal parameters,...
Page 80
setting terminal parameters, tools needed for installation, setting up IRF fabric, topology technical specifications, planning IRF cabling scheme, 37, verifying installation, topology (IRF fabric), workbench mounting switch, troubleshooting system administration configuration terminal problems, troubleshooting configuration terminal fan failure, problems, garbled terminal display, troubleshooting fan failure, hot swappable fan failure, troubleshooting hot swappable fan failure,...