Nqa Collaboration Configuration Example - HPE FlexFabric 5700 Series Network Management And Monitoring Configuration Manual

Hide thumbs Also See for FlexFabric 5700 Series:
Table of Contents

Advertisement

Jitter number: 9
Min/Max/Average jitter: 1/10/4
Positive jitter number: 6
Min/Max/Average positive jitter: 1/9/4
Sum/Square-Sum positive jitter: 25/173
Negative jitter number: 3
Min/Max/Average negative jitter: 2/10/6
Sum/Square-Sum positive jitter: 19/153

NQA collaboration configuration example

Network requirements
As shown in
A. Associate the static route, a track entry, and an ICMP echo operation to monitor the state of the
static route.
Figure 51 Network diagram
Configuration procedure
1.
Assign each interface an IP address. (Details not shown.)
2.
On Switch A, configure a static route, and associate the static route with track entry 1.
<SwitchA> system-view
[SwitchA] ip route-static 10.1.1.2 24 10.2.1.1 track 1
3.
On Switch A, configure an ICMP echo operation:
# Create an NQA operation with administrator name admin and operation tag test1.
[SwitchA] nqa entry admin test1
# Configure the NQA operation type as ICMP echo.
[SwitchA-nqa-admin-test1] type icmp-echo
# Configure 10.2.1.1 as the destination IP address.
[SwitchA-nqa-admin-test1-icmp-echo] destination ip 10.2.1.1
# Configure the operation to repeat at an interval of 100 milliseconds.
[SwitchA-nqa-admin-test1-icmp-echo] frequency 100
# Create reaction entry 1. If the number of consecutive probe failures reaches 5, collaboration is
triggered.
[SwitchA-nqa-admin-test1-icmp-echo] reaction 1 checked-element probe-fail
threshold-type consecutive 5 action-type trigger-only
[SwitchA-nqa-admin-test1-icmp-echo] quit
# Start the ICMP operation.
[SwitchA] nqa schedule admin test1 start-time now lifetime forever
Figure
51, configure a static route to Switch C with Switch B as the next hop on Switch
156

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents