Software Requirements For Commissioning On Profinet Io; Requirements For Commissioning The Et 200S On Profinet Io; Steps For Commissioning The I/O Device; Commissioning And Startup Of The Et 200S On Profinet Io - Siemens SIMATIC ET 200S Manual

Distributed i/o system
Hide thumbs Also See for SIMATIC ET 200S:
Table of Contents

Advertisement

6.2.2

Commissioning and startup of the ET 200S on PROFINET IO

Software requirements
Table 6-25 Software requirements for commissioning on PROFINET IO
Engineering software
used
STEP 7
Configuration software
for a different I/O
controller
Requirements for commissioning the ET 200S
Table 6-26 Requirements for commissioning the ET 200S on PROFINET IO
Prior Activity
1. I/O device installed
2. I/O device wired
3. MMC inserted; I/O device configured with device name
(configured and parameters set)
4. Supply voltage switched on for I/O controller
5. I/O controller switched to RUN mode
Commissioning the ET 200S
Table 6-27 Steps for commissioning the I/O device
Step
1.
Switch on the supply voltage for the I/O device.
2.
Switch on the supply voltage for the load as necessary.
ET 200S Distributed I/O System
EWA-4NEB 780602402-12
Version
As of Version 5.3
You use HWCONFIG and the supplied device database
and ServicePack 1
file.
You need the device database file of ET 200S.
Procedure
Commissioning and Diagnostics
Notes
See
Section 4
Section 5
Section 6.2.1
Manual for I/O controller
Manual for I/O controller
See
Section 8.6
6-59