Guide Through This Manual - Siemens SINAMICS G120 Original Instructions Manual

Sinamics g120 inverter with cu230p-2 control units
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Introduction

2.2 Guide through this manual

2.2
Guide through this manual
In this manual, you will find background information on your inverter, as well as a full
description of the commissioning procedure:
24
Here you will find information about the
hardware of your inverter and the
commissioning tools:
• Identifying the converter (Page 25)
• Overview of the inverter installation
(Page 41)
All information relating to the commissioning of
your inverter is located in the following
chapters:
• Basic commissioning (Page 80)
• Adapting the terminal strip (Page 93)
• Configuring the fieldbus (Page 107)
• Setting functions (Page 225)
• Backing up data and series commissioning
(Page 323)
Information regarding the maintenance and
diagnostics of your inverter is located in the
following chapters:
• Corrective maintenance (Page 343)
• Alarms, faults and system messages
(Page 355)
The most important technical data for your
inverter is located in this chapter:
• Technical data (Page 373)
The appendix contains some background
information and explanatory examples:
• Appendix (Page 411)
Inverter with CU230P-2 Control Units
Operating Instructions, 11/2013, FW V4.6.6, A5E02430659B AG

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120dCu230p-2

Table of Contents