S Cheduling - Black Box LPB2910A User Manual

Lpb2900 series gigabit managed poe+ switches
Hide thumbs Also See for LPB2910A:
Table of Contents

Advertisement

 
2-­‐   1 3.3   S cheduling  
This  page  allows  the  user  to  make  schedule  PoE  power  supply  management.  PoE  Scheduling  not  only  
makes   P oE   m anagement   e asier,   b ut   a lso   s aves   m ore   e nergy.  
 
Web   I nterface    
To   D isplay   P ower   O ver   E thernet   S cheduling   i n   t he   w eb   i nterface:  
1.       Click   C onfiguration,   P oE,   a nd   S cheduling.  
2.       Select   t he   l ocal   p ort   a nd   e nable.  
3.       Select   t ime   a nd   d ay   t o   s upply   p ower.  
4.       Click   A pply   t o   a pply   t he   c hange.  
 
Figure   2 -­‐13.3:     The   P oE   S cheduling
 
Parameter   d escription:  
Power   S upply   C onfiguration  
Port:  
This   i s   t he   l ogical   p ort   n umber   f or   t his   r ow.  
Status:  
 
143
Publication date: Sept, 2015
Revision A1
 
 
 

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lpb2926aLpb2952a

Table of Contents