Maintenance Counters 4 - Stratasys J750 User Manual

3d printing system
Hide thumbs Also See for J750:
Table of Contents

Advertisement

Stratasys J750 User Guide
Replacing the
The tubes that pump waste material from the roller waste collector and the 
Waste-Pump
purge unit should be replaced after 1500 hours of printing. At this time, a 
Tubes
counter should display a maintenance message on the printer interface 
screen. 
Figure 4-116 Maintenance message
You can verify that the pump tubes need to be replaced by examining the 
waste pump maintenance counters. 
To open the Maintenance Counters screen:
➢  Click on the "Maintenance Required" indicator.
or—
➢  From the Options menu, select Maintenance Counters.
Figure 4-117 Selecting Maintenance Counters from the Options menu.
When the Maintenance Counters screen opens, scroll down to the General
Pumps section.
Figure 4-118 Pump Maintenance Counters
The waste-pump tubes that require replacing are displayed in red.
Note: If the check box on the right is selected, the "Maintenance Required"
indicator appears when that task is due.
DOC-08040 Rev. E
4 Operating and Maintaining the Stratasys J750 3D Printer
4-76

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents