Connect the flush surfaces of the holes with a jig saw.
Hood and Scoop
", ⅜" drill bits, marker, ruler, tape measure, jig saw or air saw, rivet gun.
Drill,
3
/
16
Hood scoop, hood, secondary body fasteners.
Mark and drill around the edge of the scoop for rivets. They will be
every 3".
408
www.factoryfive.com
508-291-3443
" rivets and are normally spaced
/
3
16
Need help?
Do you have a question about the MK4 ROADSTER and is the answer not in the manual?