Plot Charts - HPE XP7 User Manual

Storage, performance advisor software 7.1
Hide thumbs Also See for XP7:
Table of Contents

Advertisement

S.No. Chart elements
7
Data points
8
Threshold line
9
Zoom panel
IMPORTANT:
By default, the performance graphs in the Chart View are plotted only for the last 1 hour of the
management station's time.
NOTE:
These selections work only on the active chart windows.
If the total number of data points from all the performance graphs exceeds 500 in a chart
window, the data points are not rendered to optimize the charting functionality in PA. You can
hover the pointing device over the line graphs to view the data points.
The performance or utilization graphs for inactive components will only have the start and end
data points plotted in the chart window, and connected by a straight line.
For every individual component the percentile value is displayed in the tool tip.

Plot charts

Prerequisite
The performance data is collected.
30
Plot charts
Description
Displays the data points plotted in a chart. By default, only the
data points that are plotted for the last one hour of the
management station's time are displayed in the detail pane.
The red dotted-line horizontal to the X-axis (Date and Time)
indicates the threshold line/threshold value for metrics.
Displays the zoom bar to zoom in on data points for a specified
threshold duration.

Advertisement

Table of Contents
loading

Table of Contents