Mains Voltage and Power

Consumption
The AK 95 S must be plugged into a grounded
power point not more than 3 metres distant.
Mains voltage:
100 V(at 50 Hz or 60 Hz)
110 V(at 50 Hz or 60 Hz)
230 V(at 50 Hz or 60 Hz) (±12%)
Power consumption:
2025 W at 230 V
1575 W at 110 V
1275 W at 100 V
Service Outlets
One extra grounded power socket should be
available close to the AK 95 S, for troubleshoot-
ing and maintenance purposes.
Line Fuses
Never overload the line fuses and do not supply
too many systems via a single line fuse.
Mains Water Supply
Required quality:
Level of purity according to ASAIO and AAMI
recommended standards on feed water for
dialysis monitors.
Water for the dialysis unit has to be supplied
from a Reverse Osmosis purification system.
Pressure:
1.2 - 6 bar to the pressure regulator mounted in
the MM 95.
Note! The pressure should be measured with
the flow from the water supply.
Temperature:+5 °C to +30 °C (treatment)
Consumption in treatment:
AK 95 S: 500 ml/min
AK 95: 550 ml/min
Drain: Open type. Not more than 1.2 metres
above outlet from fluid monitor.
Note! Local ordanances may require the use of
special measures to protect against the possibil-
ity of back-siphonage from dialysis equipment
into the water supply. When installing the
AK 95 S, such ordanance should be observed.
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
Tools
The tools listed below are needed during the
installation procedure.
Tube cutter, 113 500 084
Adjustable wrench, 113 003 009
Hexagon spanner set
Screwdriver, 1,2 x 8,0 - 175mm,
113 002 006
Top Tray
To avoid leakage into the machine, the top tray
must always be placed on the top of the ma-
chine, except during technical service.
Lift points
Installation Guide
B
A
Acet ate
Lift points
Figure 2. AK 95 S
1:3